Harbour to Hill
Salt air, civic centre, old observatory.
Morrow Rail / coastal line 04
We keep 94 kilometres of track, 38 stations, and the small in-between moments moving together.
Designed around the passenger, not the timetable.
01 / Network in motion
Every line has its own tempo. Together they form a public space that reaches beyond the platform edge.
Salt air, civic centre, old observatory.
South market, three parks, one slow corner.
Studios, workshops, and the midnight platform.
02 / Station stories
We design for the pause before departure: a clear sign, a warm light, a bench that faces the right way.
Wayfinding / 07:18
Station names are the beginning of the journey. Follow the colour, read the room, and let the city come to you.
Read the station guide ->People / every day
From step-free platforms to quiet carriages, our network is measured by the ease it gives back to passengers.
See accessibility updates ->03 / Service status
Live conditions change quickly. This page shows an honest sample of how we keep the important information close.
All six lines are open. A planned lift inspection is taking place at North Exchange after 22:00.
Get travel options| Line | Condition | Next |
|---|---|---|
| Harbour / Hill | On time | 04 min |
| Garden Loop | On time | 08 min |
| North Exchange | Planned works | 12 min |
| Airport Spur | Busy | 06 min |
04 / Plan a journey